img
OUR PROJECT

2800 m3/h-H2S 300 ppm-Griffith City Council Wastewater Reclamation Plant Odour Control System

OdaTech completed installation of an odour control system
to extract and treat foul air from the inlet works at the
Griffith City Council Wastewater Reclamation Plant. A full
design, supply, install and commission contract was
awarded through tender and OdaTech’s system is sized to
treat up to 3000m3/h of foul air in a two-stage
biofiltration process with backup activated carbon filter.

In addition to the system itself, all air extraction
ductwork wa designed and installed by OdaTech to ensure
that all possible odour sources in the inlet works were
adequately ventilated.

img
CONTACT US

GET IN TOUCH

    Keep Upto Date

    Subscribe To Our Newsletter